Non-Compliance detail


  
Summary
 
Licence number: 2122
Annual Return Start: 27 Jul 2003
Annual Return End: 26 Jul 2004
Date Received: 24 Sep 2004
 
Licence Condition numberType of non-complianceEPA actionsNo. of times occurred
M3.1 Stack monitoring not undertaken in accordance with the requirements of AS4323.1-1995. EPA has written to licensee regarding non-compliance and relevant action 1
M3.1 Continuous on-line dust burden monitoring not compliant with requirements of the specified sampling method. PRP to address non-compliance(s) being negotiated 1
M2.1 Plant failure on 29/3/04 caused shutdown of boiler plant, preventing monitoring of chlorine, hydrogen chloride, sulphuric acid mist and sulphur trioxide (as SO3). Appropriate Action taken by licensee 1